Companies face the same challenges when building IT infrastructure:
Outdated infrastructure can't handle new demands
Data center from one vendor, network from another, security from a third. Who's accountable?
Few providers in APAC and LATAM offer full-cycle competencies
Premium pricing isn't always justified for regional projects
IronGrid96 covers the entire IT infrastructure stack: from data center design to security system configuration.
Engineering, Procurement, Construction, Handover
We select optimal equipment for your task and budget
Infrastructure transfer without service interruption
Methodologies developed under constrained conditions
Design and construction of data centers of any scale — from server rooms to commercial facilities.
Technologies: CFD Modeling, BIM Design, Free Cooling
Building network infrastructure of any complexity — from campus networks to distributed WANs.
Vendors: Cisco, Huawei, Aruba, Juniper, MikroTik
Server solutions and storage systems for any task — from virtualization to AI/HPC clusters.
Vendors: Dell, HPE, Supermicro, Lenovo, Huawei
Comprehensive infrastructure protection — from architecture to operational monitoring.
Vendors: Positive Technologies, Solar, Cisco, Checkpoint
Up to 35% faster than standard timelines. Parallel execution of stages.
Business continuity first. Minimal maintenance windows for 24/7 operations.
Not tied to a single vendor. We select the optimal solution.
Proprietary methodologies developed under constrained conditions.
| Parameter | Traditional Approach | IronGrid96 |
|---|---|---|
| Contractors | 3-5 different companies | Single integrator |
| Timeline | 18-24 months | Up to 35% faster |
| Accountability | Distributed among contractors | Single SLA |
| Coordination | Client's responsibility | Our responsibility |
| Result Guarantee | Partial | Full |
Audit, requirements, architecture, specifications, budget
Procurement, logistics, parallel site preparation
Installation, configuration, integration, testing
Handover, documentation, training, support
Built from scratch a commercial data center for hosting customer equipment of a telecom operator. Full cycle: design → supply → installation → commissioning.
Data center reconstruction while maintaining continuous operation. Phased construction with equipment migration.
Complete Cisco technology stack replacement with Huawei solutions. Seamless migration without service interruption.
Complete physical infrastructure transfer between sites. All systems launched by start of business day.
IT systems architectural changes and information security subsystems implementation.
Micro-cellular communication infrastructure in administrative-industrial building.
Our partner in modular micro data center solutions.
Manufacturer with 35+ years in IT infrastructure, in-house R&D, patented technologies, and 270+ deployments.
Self-contained modular micro-DC from 24U to 480U. Scalable 1-10 rack configurations with 5-15 kW cooling per rack. Plug-and-play — just connect power.
Engineering, Procurement, Construction, commissioning, and handover. Single contract, single accountability, fixed timeline.
Audit and requirements, design, procurement and logistics, installation and commissioning, documentation and training, warranty support.
Architecture development and implementation without subsequent operational support. Suitable for companies with their own operations team.
Assessment and requirements, technical design, specifications and BoM, implementation and integration, documentation handover.
Expert support at any stage: from concept formation to contractor quality control.
Existing infrastructure audit, architecture development, requirements and specifications formation, design solution expertise, implementation supervision.
Maintenance and development of existing infrastructure. For companies needing expertise without expanding headcount.
Monitoring, scheduled maintenance, incident management, change management, reporting and SLA.
"We stay until it runs flawlessly. Your success is our SLA."
Tell us about your task — we'll provide preliminary assessment of timeline, budget, and approach.
Submit Request